Morning view down a common green between two rows of townhomes, with a compact play structure in the same warm grey, charcoal and sand colors as the homes, its tower on the path side and a swing bay swinging along the green

Community and HOAPlaygroundsPlayground Equipment for Residential Communities

Compact play areas for common areas among homes, in your homes’ colors, with the project file re-issued to your board at handover.
  • Project file re-issued to your board at handover
  • Reserve-study parts list by part number
  • RAL code recorded for every part
  • Structures pre-assembled in our factory before packing
  • ASTM F1487 / EN 1176 design, 12+ years in commercial play
02/ 13 · What common areas order most

Community Playground Equipment RangeCompact Structures, Swings, Freestanding Play, Resident Fitness and Signs

Community playground equipment drawn for common areas among homes: a tot lot beside the clubhouse, a green between townhome rows, a condominium courtyard or several parks across a master-planned community. These are the pieces an HOA playground and an amenity center order most.

Every piece is commercial-grade, made for sites open to every resident: Ø114 mm galvanized and powder-coated posts, 19 mm HDPE panels and rotomolded LLDPE slides, the materials of our whole outdoor line.

  • Low tot lot structure for ages 2–5 beside a clubhouse, with a short slide, a crawl tunnel and ground-level play panels in sand and warm greyRP-01.1 · Ages 2–5

    Tot lot structures, ages 2–5

    Tot lot equipment with a low deck or two, a short slide, a crawl tunnel and play panels at ground level.

    In-houseStructures
  • Structure for ages 5–12 with a steel-core rope net, climbers and a longer slide on a community greenRP-01.5 · Ages 5–12

    Structures, ages 5–12

    Climbers, 16 mm steel-core rope nets, longer slides and overhead climbing.

    In-houseRope nets
  • Swing bay with a belt seat and a toddler bucket seat set along a community greenRP-01.3

    Swing bays

    Belt seats, and bucket seats for toddlers, set along the green.

    In-houseSwing sets
  • Two rotomolded spring riders and a seesaw beside a path in a residential common areaRP-01.6

    Spring riders and seesaws

    Rotomolded bodies that fit small lots and path edges.

    In-houseRiders
  • Freestanding HDPE play panel on its own posts with an engraved community emblemCNC · 19 mm HDPE

    Play panels on their own posts

    19 mm HDPE cut on our CNC routers, with the community emblem if you want it.

    In-house
  • Robinia climbing frame and balance trail beside timber-look powder-coated steel play piecesRP-01.7

    Nature play and timber-look steel

    Robinia climbing frames and balance trails from our partner timber workshop, or steel with a wood-grain finish.

    Partner timberNature play
  • Three warm grey outdoor fitness stations beside a community play area, used by adult residentsRP-10 · Ages 13+

    Outdoor fitness for residents

    A compact set of stations beside the play area.

    In-houseFitness
  • Shade sail on its own posts over the parent seating edge of a community play areaRP-09 · On its own posts

    Shade over parent seating

    On its own posts, outside every equipment use zone.

    Frames in-houseShade
  • Grey and sand EPDM surfacing under a play structure, matching the paths and planting around itRP-08

    Safety surfacing

    Rubber tiles or poured-in-place EPDM, colored to sit with your paths and planting.

    Partner-builtSurfacing
  • HDPE rules sign on a post at the entrance to a community play area, text unreadableCNC · Engraved

    Entry and rules signs

    CNC-engraved HDPE with the community name and emblem.

    In-houseSigns
03/ 13 · Four kinds of residential site

Residential Community LayoutsMaster-Planned Communities, Townhome Greens, Condo Courtyards and Podium Decks

Each type of residential site gets a different starting layout on our drawing, and the same residential playground equipment is arranged for how the homes enclose the ground.

High view of a master-planned community's amenity area: clubhouse, pool and the main play area in the clubhouse colorsMain amenity area

Master-planned communities

A larger community often has a main amenity area beside the clubhouse or pool and smaller play areas in each neighborhood. The main area carries separate 2–5 and 5–12 structures, swings and a resident fitness set; the smaller areas carry one compact structure and a few freestanding pieces.

One community drawing. Every play area gets its own structure numbers on one community drawing, so the whole community is planned and quoted together and built in phases.

Compact play structure, a swing bay and spring riders on a green between two rows of townhomes

Townhome and single-family greens

A green between rows of homes usually has room for one compact structure, a swing bay and spring riders along the path. The layout is drawn to the shape of the green, with walkways from the homes and parent seating at the edge.

Low, open play pieces in a courtyard enclosed by a low-rise condominium on three sides

Condominium and apartment courtyards

Courtyards are enclosed by the building on several sides, and compact structures and low freestanding pieces keep the view open from the windows around the court.

Podium decks. This apartment playground equipment also stands on podium decks and slabs on , with the fixing confirmed by your structural engineer, as on preschool and daycare playgrounds.

A steel plate welded to the foot of a post and bolted to the deck or slab, used where a concrete footing cannot be dug.

An older community play area between homes, faded but intact, before renovation

Existing community parks

A renovation starts from photos and a plan of the current play area, and the new layout is drawn on the same footprint or a revised one. Renovation

04/ 13 · Drawn with the homes around it

Placement Beside HomesTall Elements and Swings Facing Away From Back Yards and Windows

A neighborhood playground often sits a few lots from someone’s back yard, so every layout is drawn with the homes around it: back yards, the windows that face the green, the lot lines and your setback lines.

Layout · a green between two rows of homes

Tall and enclosed elements

Towers, roofs, tunnels and tall panels face away from back yards and windows, so the tallest part of a structure does not look into a neighbor’s home. Between two rows of homes, the open side faces the path and the parent seating.

Swing direction

Swings are set to swing along the green, with the swing path facing away from back yards and windows. The swing is drawn on the plan and kept clear of paths and seating.

The ground around a piece that a child can fall or swing into; it gets impact-absorbing surfacing and no other equipment.

Music panels

Play panels with metal chimes are placed farther from the homes, toward the middle of the common area.

Compact structures for small common areas

Where the common area is small, the layout uses compact structures and freestanding pieces instead of one large structure, and the surfacing area table shows exactly how much ground each piece needs.

View from behind a low hedge in a back yard across the green to a play structure whose tower faces the pathFrom a back yard

Setbacks

Your landscape architect sets the distance from lot lines and homes under local rules. The layout is drawn to the you give us, on your DWG base and coordinates when you send one.

The minimum distance a structure must keep from a lot line or a building, set by local rules and your landscape architect.

How the design office draws a layout

Six layers on every layout

Point at a layer to see it on the plan.

One community drawing, every play area numbered, colors approved by your ARC before production.

  • 01One drawing
  • 02Every play area numbered · S1 · S2 · S3
  • 03ARC-approved colors
05/ 13 · Colors taken from your homes

Community Colors, Emblem and SignsMatched to Your Homes and Recorded by RAL Code

Every steel post, frame and deck takes a powder-coat color picked to match the trim, roofs or stone of the homes around the common area.

The RAL chart is the European standard numbering of paint colors; one RAL code gives the same color on every batch, years apart.

Side of a home in warm grey siding, charcoal roof and sand stone base, with a play structure beside it in the same three colors
Siding color on the steel postsSame color · RAL code on file
Roof color on the rotomolded roofsColor through the full wall
Stone color on the HDPE panelsSame color · recorded per part

Colors matched to your homes

Send photos of the homes, or the colors in your design guidelines. Each steel color is matched on the RAL chart to the trim, roofs or stone around the common area.

Rotomolded slides, tunnels and roofs come in standard or custom colors, with color through the full wall, so a scratch shows the same color.

For communities with natural landscaping, steel parts can carry a wood-grain finish, or the play area can use Robinia timber pieces, see nature playground equipment.

Your emblem on panels and signs

Your community emblem goes onto panels and signs in one of three ways: engraved on our CNC routers, set into two-color HDPE, or printed as a decal for roofs and signs.

On your project file
The RAL or color code of every part
The CNC cutting files of custom panels
The logo source files
Community emblem CNC-engraved into an HDPE play panel, close view, text unreadableCNC-engraved

Engraved emblem

Cut into 19 mm HDPE on our CNC routers.

Two-color HDPE panel with the emblem set into the sheetTwo-color HDPE

Two-color inlay

The emblem set into the sheet in a second color.

Printed decal with a community emblem on a rotomolded play structure roofPrinted decal

Decal for roofs and signs

Printed for rotomolded roofs and sign faces.

Entry and rules sign at a community playground with a blank block at the bottom, text unreadableEntry sign

Community playground signs

Every structure carries a manufacturer label and an age-range label. Entry signs with the age range and rules are CNC-engraved in HDPE, with the community name and emblem and a blank block for the management company’s contact details, the same signs used on park playgrounds.

06/ 13 · What your committee reviews

ARC Submission PackageColor Samples, Renders and Single-Item Elevations With Deck Heights

Most communities have design guidelines, and new hoa playground equipment goes to the before it is built. The files your ARC reviews come ready, and every color is recorded so the playground can be matched again years later.

The ARC: the committee of an HOA that approves anything built or changed on community property against the community’s design guidelines.

RAL color chips for steel and rotomolded color samples laid out on a table beside a printed planExhibit A · samples

Exhibit A · samples beside your homes

RAL chips for every steel color and rotomold color samples for slides, tunnels and roofs, sent to your committee or photographed for approval, next to the colors of your homes.

Eye-level 3D render of the proposed play area on a green between townhomesEye level
Aerial 3D render of the same proposed play area with both rows of homes and the setback linesAerial · same model
A plan and two elevations for every piece, with the deck heights and use zone dimensions your committee asks for.
Annual owners' meeting in a clubhouse, residents looking at renders on a projection screenAnnual owners’ meeting

Annual owners’ meeting

The same renders and elevations can be shown at your annual owners’ meeting, so owners see the colors and heights the committee approved.

On request, the design office draws an alternative layout within your budget range for the committee to compare.

Alternative layout within your budget range

Approval before production

  1. Drawing approvalColors and customization are frozen when you approve the drawing.
  2. First-piece photoCustom theme panels, such as a panel with the community emblem, get a first-piece photo before the batch is cut.
  3. A change after approvalIt goes onto a revised drawing that you approve again.
07/ 13 · Opened with the clubhouse and pool

Developer Amenity ProjectsLoading Date Planned Back From the Amenity Opening

For a developer, the playground is part of the amenity package, usually opened with the clubhouse and pool before or while the first homes are sold.

Files for your landscape contractor

  • Footing detail drawings with the concrete footing size for every post
  • Installation drawings and part lists
  • Step-by-step videos
By your contractor
Excavation, footings, local permits and inspections, and installation labor.
Optional
An on-site supervisor from us.
Installation details
Steel post being welded in the steel fabrication workshop at the start of production
01 · Production start
Warm grey and charcoal frames hanging on the powder coating line
02 · After coating
A community play structure standing fully pre-assembled in the factory yard
03 · Pre-assembly
Frame from the pre-assembly video: your structures standing in the factory yard
04 · Pre-assembly video
Numbered parts loaded into a container in installation order
05 · Loading
Container doors closed and sealed, photographed before shipment
06 · Container sealed

Before shipment

Photo updates at four points: production start, after coating, pre-assembly and loading. The pre-assembly video shows your own structures standing in our yard, and the container is photographed before it is sealed.

On site, parts are unpacked in the order they are installed, each carrying its number from the installation drawing.

Later phases

When the community grows, each new phase is ordered to the same project file, with the same part numbers, molds and RAL colors, so the new neighborhood’s playground matches the first one.

08/ 13 · When the board takes over

Developer HandoverProject File Re-Issued to the Board, Warranty Unchanged

At handover the HOA board takes over the playground, and the is re-issued to the board or its management company.

The electronic package for one project: approved and installation drawings, part list, QC readings, photos and videos, kept by the owner and on file with us.

An open project file with installation drawings and part lists on a clubhouse table, a tablet showing the paused pre-assembly videoProject file
Project file · contents
  1. Approved drawings
  2. Installation drawings
  3. Footing drawings
  4. Part list
  5. Packing list
  6. QC readings
  7. Pre-assembly photos and video
  8. Loading photos and video
  9. Inspection and maintenance guide
  10. Any third-party test report
  11. Sent with the shipping documents
  12. Same package on file with us

The warranty carries over unchanged and is counted by component: steel structure 10 years, rotomolded and HDPE parts 5 years, rope and moving parts 2 years. Replacement parts and questions then go through the board or its manager, to the same project manager.

What your board receives · 3 working days
  • 2D plan with the homes and setbacks
  • 3D renders · aerial and eye level
  • Single-item elevations
  • Itemized quotation
Anna, Sales Manager at Run Playgrounds

Put your common area plan and color guidelines in front of our design office

Send them to Anna, Sales Manager. Your board gets renders, elevations and an itemized quotation in 3 working days.

09/ 13 · What the board plans its reserves from

Reserve-Study Parts ListFive Columns, Every Part by Part Number

With the project file, the board receives a parts list it can plan its reserves from. Part numbers follow the layout: in S1-014, S1 is the structure number on the plan; fitness stations carry F numbers, shade carries H numbers and surfacing zones carry P numbers.

A reserve study is the HOA’s long-term plan of which common components will need repair or replacement, and how much to set aside for them each year.

Re-issued to the board at handover · every part number is on your layout
Example reserve-study parts list for one community play area: part number, component, installation date, warranty period and recommended spares
1Part number 2Component 3Installation dateAs confirmed by your installer 4Warranty period 5Recommended spares
PostDD · MM · YYYY10 years · steel structure—
DeckDD · MM · YYYY10 years · steel structure—
PanelDD · MM · YYYY5 years · HDPEKeep on the shelf
SlideDD · MM · YYYY5 years · rotomolded—
RoofDD · MM · YYYY5 years · rotomolded—
Rope netDD · MM · YYYY2 years · rope—
Swing seatDD · MM · YYYY2 years · moving partKeep on the shelf
BearingDD · MM · YYYY2 years · moving partKeep on the shelf
Shade fabricDD · MM · YYYYWear part · remade by part numberKeep on the shelf
Surfacing zoneDD · MM · YYYYWear surface · repaired to the zone recordKeep on the shelf

Your reserve specialist sets the useful life of each component in the study, working from this list and the material spec sheet.

S1 H1 W1 F1 P1

Point at a row to find the part on the layout.

Open steel mold in the rotomolding workshop beside a freshly molded sand-colored slideSame steel mold

Made to the original part number

  • Slides from the same steel mold
  • Custom panels cut from the stored CNC file
  • Colors from the recorded RAL code
  • Touch-up paint in your structure’s color in every shipment
Maintenance room shelf with spare parts in boxes sorted by part number, labels unreadableOn your shelf

A replaced part fills the same line

S1-014PanelInstalled
S1-014PanelReplaced · same line

The replacement carries the same part number, so the reserve list never needs a new row.

Community manager photographing a cracked corner of an HDPE panel with a phoneOne photo · one part number

A photo and a part number

When a part is damaged, your manager sends a photo and its part number, and we reply within 24 hours on business days. Small parts go by air courier, and parts can be ordered outside a main order.

10/ 13 · Replacing a playground the community has had for years

Renovating an Existing Community PlaygroundBoard Approval, Removal and New Footings

Many HOA boards are replacing a playground the community has had for years. The board starts with photos and measurements of the current area, and the design office returns a new layout on the same footprint or a revised one, with renders and an itemized quotation for the board meeting.

Existing area · new layout
ExistingExisting S1W1 S1S2W1 Surfacing · its own layer and area table
An older play structure in a residential common area, faded after years of use, homes behindBefore renovation

Removal of the old equipment and excavation are done by the community’s contractor, and the new footings follow our footing detail drawings.

  • Removal and excavationBy the community’s contractor.
  • FootingsNew from our footing drawings; old footings are reused only when your engineer confirms them.
  • SurfacingDrawn as a separate layer with its area table, so the board sees which surfacing is replaced under each structure.
Fewer structures
Standard colors
Slides from existing molds

Material specifications · the same on every quotation
A budget is met by adjusting scope with the three levers above; the materials do not change.

When the reserve budget covers part of the plan, the layout can be built in phases on the same project file. How quotations are built

11/ 13 · Several HOAs, one account

Management Companies With Several CommunitiesOne Project File and One Quotation per Community

A property management company often looks after playgrounds in several HOAs, each with its own board and its own reserve budget. The account is set up to match: each community has one project file and one quotation, addressed to that community’s board.

Community A
  • Addressed to the Community A board
  • One project file · one quotation
  • Its own reserve-study parts list
  • Its own recommended spares
Community A spares
Cracked corner of an HDPE panel photographed by a community manager
Community A
S1-014 · panel
Worn swing seat where it meets the hanging chain
Community B
W1-004 · swing seat

Two photos, two part numbers, one message.

One project manager for all your communities

Knows every project file and handles every layout request, parts request and warranty question.

Community B
  • Addressed to the Community B board
  • One project file · one quotation
  • Its own reserve-study parts list
  • Its own recommended spares
Community B spares
Separate shelves · separate budgets

Each board approves and budgets for its own playground, and each community’s reserve-study parts list and recommended spares cover that community’s parts. A manager can send one message with photos and part numbers from two communities, and each part is checked against its own community’s file.

Parks departments that keep one shared spares stock across many parks are covered on park playground equipment.

12/ 13 · Into your board’s file

Standards and Files for Community PlaygroundsASTM, EN, CSA and AS With the Compliance List

Each quotation for community playground equipment names its compliance documents, and all of them go into the project file your board keeps.

Into your board’s project file
  1. An item-by-item design compliance statement
  2. The material spec sheet
  3. Critical-fall-height data for the surfacing
  4. Installation drawings showing every use zone

If your board or insurer wants third-party testing, we arrange it for the project and quote it on its own line. Playground safety standards

Standards by market for community playground equipment, surfacing, accessible surfacing and resident fitness stations
ItemUSUK & EUCanadaAustralia
EquipmentASTM F1487 + CPSC HandbookEN 1176CSA Z614AS 4685
SurfacingASTM F1292EN 1177
Accessible surfacingASTM F1951—
Resident fitness · 13+ASTM F3101EN 16630

US communities also get the CPSC Public Playground Safety Handbook applied to the design; fitness stations are for ages 13 and up.

A board member turning through compliance documents and spec sheets on a clubhouse table, text unreadableCompliance documents

Buying Routes: Board Direct, Management Company, Developer, Installer or Dealer

HOA boards buy from us direct, and their local installer builds from our footing and installation drawings.
Management companies buy direct for each community, with one project manager for all of them, and the local installer builds from our drawings.
Developers buy direct or let their landscape contractor place the order, with the loading date planned back from the amenity opening.
Landscape contractors place the order for the developer or the HOA and receive the footing detail drawings, installation drawings and videos.
Installers and dealers building community amenities get the layout and quotation with no brand or with their own, and each community project is registered in the dealer’s name. Dealer terms are on wholesale playground equipment.
A printed community site plan, photos of the homes, a small stack of RAL chips and a satellite view on a phone on a clubhouse tableWhat to send
Send with your first message

What to Send for a Community or HOA Playground Layout

Paste these points into your first email or WhatsApp.

Site

  • A dimensioned plan of the common area, or a satellite view with photos
  • The homes around it: back yards, windows facing the area, lot lines and setback lines
  • Paths, parking, the clubhouse or pool, and trees to keep
  • Site type: new amenity, renovation, or a podium deck or courtyard

People

  • Age groups in the community (2–5, 5–12) and whether residents want fitness stations

Look

  • Community colors: photos of the homes, or the colors in your design guidelines
  • Community name and emblem file for signs and panels

Process

  • Your approval steps: board, ARC, annual owners’ meeting
  • For developers: the amenity opening date and your landscape contractor

Scope

  • The playground standard your community or insurer works to
  • Budget range, phases planned, and your route
Approval steps

File attached? Anna will ask you to send it by email or WhatsApp after the form arrives.

Form not going through? Message Anna on WhatsApp +86 177 0272 7677

Send Your Site Plan WhatsApp