05/ 12 · Opening day is the fixed point
FEC Opening ScheduleLoading Date Planned Back From Your Opening Day
Your opening date is the fixed point. The project manager plans the loading date back from it, and your contractors' work runs at the same time as our production. Every attraction is scheduled to the same loading date, including the partner-built ones.
Before approval
The layout, renders and itemized quotation come back within 3 working days of receiving your floor plan. Your comments go onto revised drawings until you approve.
20–30 days of production
On the approval day steel cutting and welding, soft play sewing and the partner orders for jump beds, inflatables and rides all start at the same time. You get photo updates at four points: production start, after coating, trial assembly and loading.
Meanwhile on site
Your contractors work from the coordination layer. They prepare the slab and anchors, the in-ground pits and the power points, and do the fit-out, fire systems and HVAC for the building.
Shipping and arrival
Sea freight time is quoted for your destination port. Loading photos of each container reach you before it is sealed. Your installer builds from the step drawings and videos, with an on-site supervisor as an option. Each stage is described on