A factory pre-assembly yard in morning sun with one complete order laid out from far to near: a grey shipping container, two pre-assembled evergreen play structures, swings and spring riders, a bundle of shade posts and pallets of rubber tiles, a QC inspector checking a printed drawing
Quotation · line by line · USD

Playground Equipment CostWhat Drives the Price of a Commercial or Indoor Playground

Playground equipment cost, set out line by line on an itemized quotation drawn from your own site layout. Send your site plan with a budget range; the layout and itemized quotation come back together within 3 working days.

  • Freight · 20GP / 40HQ · CIFOn your quotation
  • S1 · Play structure · as drawnOn your quotation
  • S2 · Play structure · as drawnOn your quotation
  • Items · one line per itemOn your quotation
  • Shade · posts, frames, sailOn your quotation
  • Surfacing · from the area tableOn your quotation

Layout + itemized quotation in 3 working days · One line per structure number · Ø114 mm / 3.0 mm · 19 mm HDPE · 16 mm rope · 304 stainless on every quotation · Installation labor hours per structure

02/ 14Quotation · one line per structure number

Playground Quotation StructureOne Line per Structure, Surfacing, Shade, Freight and Optional Lines

This page sets out how the cost of playground equipment for a commercial playground, indoor soft play area or trampoline park is built up on our quotation: the lines it has, what each equipment line includes, which design choices raise or lower each line, and which local costs your contractor prices from our files.

Each line on your quotation matches something on your layout, and the same structure number later appears on every part of it (S1-014). How the layout itself is drawn is on playground layout design.

A printed landscape quotation clipped to a playground site plan on a design office desk, with a scale ruler and a pencil
Quotation and layout, returned together in 3 working days
  • + S1Open a line to see what it carries.
  • - - -Dashed lines: optional, on request.
  • · · ·Amounts appear only on your own quotation.
Material spec sheet · each line Compliance document list · your standard

A material spec sheet for each line and the compliance document list for your standard come with the quotation, so a specifier or tender panel can check what each line buys before the order is placed.

CurrencyUSD
Terms, CIF on request
ValidityStated on each quotation
LayoutRev A
StandardAs your project names
An itemized playground quotation: lines and what each line is priced from. Amounts appear only on your own quotation.
Line · itemFrom the layoutAmount
As drawn · parts S1-001 onward
On your quotation
As drawn · parts S2-001 onward
On your quotation
Item and its use zone
On your quotation
Item and its use zone
On your quotation
From the area table · thickness by
On your quotation
Shade positions on the layout
On your quotation
Container plan for every category
On your quotation
Optional · listed when you ask for them
On-site time, visa invitation, accommodation, local transport
On your quotation
The samples you choose
On your quotation
Per project, when your tender or insurer asks
On your quotation

Trampoline courts are numbered T1, ninja courses N1, the same way

FOBThe quotation covers the equipment loaded on board at the port of loading. CIF adds sea freight to your destination port.
Critical fall heightThe fall height the surfacing under a piece must absorb. It sets the surfacing thickness under that piece.
03/ 14S1 · what the line already carries

Included in Every Equipment LineAnchoring Hardware, Spare Kit, Pre-Assembly, Numbered Packing and Installation Files

These are part of every structure and item line. They are not listed separately, and you do not add them to your budget.

S1 · Play structureOn your quotation
  • Anchor-bolt base plates and embedded anchors laid out in rows on a timber pallet01

    Anchoring hardware

    For every post, to the footing detail drawing: set in concrete or on anchor-bolt base plates.

    Included · not listed separately
  • An open spare parts kit with stainless fasteners, post caps, plastic plugs, a small can of touch-up paint and security bits02

    Spare kit

    Fasteners, post caps, plastic plugs for vent holes, touch-up paint in the structure's color and security bits, plus spare springs on trampoline orders.

    Included · in every shipment
  • A QC inspector with a printed drawing checking a connection on a pre-assembled play structure03

    Factory pre-assembly

    Every outdoor structure assembled and signed off by QC before packing; indoor frames trial-assembled.

    Included · not listed separately
  • Numbered cartons packed in installation sequence, each with a blank white label04

    Numbered packing

    Every part numbered to the installation drawing and packed by installation sequence, with a packing list keyed to part numbers.

    Included · not listed separately
  • A printed step-by-step assembly drawing set beside a tablet lying face down05

    Installation files

    Assembly drawings per structure, footing drawings, a tool list and videos from your own pre-assembly.

    Included · not listed separately
  • A loaded container before the doors are closed, one worker photographing the load with a phone06

    Photos

    Pre-assembly or trial-assembly photos and video before packing, and container photos before sealing.

    Included · not listed separately

The structure line is the full cost of that structure arriving ready to install.

04/ 14One choice · several lines · direction only

Outdoor Playground Cost FactorsDeck Heights, Barriers, Surfacing, Slides, Frames and Colors

Commercial playground cost follows the layout: each choice drawn on it moves one or more lines on the quotation.

More decks and higher decks raise the structure line and the surfacing line together. Under the CPSC handbook, a platform above 30 in (762 mm) in a 2–5 zone, or above 48 in (1219 mm) in a 5–12 zone, needs a protective barrier in place of a guardrail, so taller decks carry more barrier panels. Higher decks also raise the , which means thicker surfacing across a larger .

For a 2–5 area, the design office can draw every deck below the 30 in (762 mm) threshold, which keeps both lines lower.

Close view of a raised deck enclosed by barrier panelsDecks
The exit of a stainless steel slideSlides
A welder TIG-welding a bent steel frameStructure build
A fiberglass theme sculpture piece in evergreen and greyTheme pieces
A RAL color chip held against a powder-coated postColors
A swing frame and spring riders in a parkItems around
Quotation · three linesDirection, never amount
S1 · Structure lineOn your quotation
  • More barrier panels
  • Stainless slide · partner-built
  • Hand-welded by TIG / MIG
  • Fiberglass · partner factory
  • Sampled and approved first
  • Component system · standard colors
Item linesOn your quotation
  • A line per item
  • Custom colors sampled first
  • Fewer items · standard colors
Surfacing lineOn your quotation
  • Thicker, over a larger use zone
  • Each item adds its use zone
  • Decks below 30 in · thinner
This is how a budget layout is drawn · Budget options▲ raises the line · ▼ keeps it lower
A multi-deck commercial play structure with grey HDPE barrier panels around the high decks, over poured rubber surfacing
High decks: protective barrier panels in place of guardrails
Slide material
Rotomolded 8 mm LLDPE slides come from our own steel molds. Stainless slides, partner-built for vandal-prone sites, raise the slide cost; existing molds keep it lower than a custom shape.
Structure build
Component-system structures (Ø114 mm posts, decks, 19 mm HDPE, 304 fasteners) cost less than custom frames hand-welded by TIG/MIG.
Theme pieces
CNC-cut HDPE theme panels and shaped roofs raise the structure line; partner-made fiberglass figures and printed graphics raise it further.
Colors and branding
Custom RAL and rotomold colors raise the line, because each is sampled and approved before production. Logos are CNC-engraved, inlaid in two-color HDPE or printed as decals.
Items around
Swings, spinners, spring riders, fitness stations and shade each add a line and their own use zone to the surfacing line.
Critical fall heightThe fall height the surfacing under a piece must absorb. It sets the surfacing thickness under that piece.
Use zoneThe area around a piece that must stay clear and be surfaced, drawn on the layout for every structure and item.

Send your site plan with a budget range and the standard your project follows.

Your layout and itemized quotation come back within 3 working days.

  • 2DLayout
  • 3DRenders
  • S1…Itemized quotation
  • hLabor hours per structure
05/ 14Above the line · fixed · below the line

Indoor Playground Cost FactorsCeiling Height, Levels, Play Elements and Theme

Indoor playground cost starts with your building: column positions, clear ceiling height, entrances and fire exits decide what the floor plan can hold.

The number of soft play levels is set by the clear ceiling height. Each level adds frame, decks, padding and netting to the structure line. Where the ceiling is low, fewer levels keep the line lower.

Raises the line

  • More levelsEach level adds frame, decks, padding and netting.
  • A ball blaster mounted on a soft play structure
    Ball blasters and air cannonsWith the compressors that run them.Partner-built
  • Electronic interactive panelsAbove manual game panels.Partner-built
  • A wide fiberglass wave slide in an indoor play venue
    Wide wave and drop slidesFiberglass, from a partner factory.Partner-built
  • A fiberglass theme figure standing beside a soft play frame
    Printed graphics, fiberglass figuresAbove HDPE theme panels.Partner-built
  • A low toddler soft play area with a small ball pit
    6–23 month areaA toddler area to ASTM F2373 adds its own structure line and ball pit.

Same on every indoor quotation

Cross-section of soft play padding: galvanized pipe inside high-density sponge wrapped in grey fire-retardant PVC
  • Ø48 mm galvanized frame
  • High-density sponge under fire-retardant PVC leather
  • Knotless fire-retardant netting

These are the same on every indoor quotation. The quantity follows your footprint and number of levels.

Keeps it lower

  • Fewer levelsWhere the ceiling is low.
  • The exit of a rotomolded tube slide into a ball pit
    Tube, spiral and roller slidesRotomolded in our own workshop, in place of partner-built fiberglass.In-house
  • A CNC-cut HDPE manual game panel
    Manual game panelsCNC-cut HDPE from our panel workshop.In-house
  • Standard color chartCovers in standard colors.
06/ 14T1 · one line per court

Trampoline Park Cost FactorsCells, Raised or In-Ground Courts and Foam Pits

Each court has one line under its T number. Each block adds a section to it; the blocks are equal because this page shows what is added, not how much.

T1 · Court lineOn your quotation

Per cell × every cell

  • Steel frame section
  • Jump bed to this opening
  • Springs to its D-rings
  • 50 mm spring-cover pads
  • Frame-top pads

Zones on the court each adds sections

  • Foam pit
  • Dodgeball netting
  • Slam dunk lanes
  • Tumble track
  • Battle beam
  • Ninja course

Finish and branding

  • RAL on exposed frame
  • Logos on wall pads

More cells raise the court line. A foam pit adds a pit frame, padded walls and edge caps, a padded jump bed base and foam blocks in fire-retardant covers.

  • Raised courtsAnchored to the floor slab with anchor bolts.
  • In-ground courtsSit in a pit your contractor builds to our drawing, which adds pit construction to your local costs. See it in the local cost table
A trampoline court in a skylit venue before opening, with a foam pit in the foreground
Court line T1 · cells, pads and a foam pit
Foam blocks in fire-retardant covers in a trampoline foam pit
07/ 14Standard inside · testing on its own line

Safety Standards and Testing on the QuotationCompliance Documents Listed, Testing as Its Own Line

Barrier heights, use zones and surfacing thickness follow the standard your project names, so the standard is already inside the structure and surfacing lines. Drawing to ASTM F1487, EN 1176, CSA Z614 or AS 4685 is built into those lines and does not appear as a line of its own.

S1 · structure · surfacing
ASTM F1487EN 1176CSA Z614AS 4685
Inside the line
Third-party testing
Its own line · when your tender or insurer asks
Five compliance documents listed on the quotation
DocumentWhat is on itFrom
Design compliance statementEach item, checked against the standard your project namesUs
Material spec sheetThe posts, panels, rope, fasteners and coatings on each lineUs
Surfacing critical-fall-height dataThe fall height each surfacing type and thickness is rated forSurfacing partner
Partner supplier documentsSuch as fire-retardant material documents for soft play covers and nettingPartner supplier
Installation drawings with use zonesEvery piece with its use zone, for your inspector and installerUs
A tender review panel of three adults checking a printed quotation and its attached documents at a meeting table
A tender panel checks each line against its documents

Third-party testing appears as its own line, so you can see its cost apart from the equipment. You can name the lab or we arrange one, and any effect on lead time is confirmed on the quotation.

08/ 14Local cost · from our file · when you have it

Local Project Costs and the Files Your Contractor Prices Them From

Your contractor or installer carries the site work. Each local cost has a file from us to price it from, and the table shows when that file reaches you.

● Yellow · in your hands before you place the order● Charcoal · after drawing approval

A local contractor measuring a footing detail drawing spread on a pickup hood at a site
Footings priced from the footing detail drawing
Local project costs, the file from us to price each one, what is on it and when you receive it
Local costFile from usWhat is on it With the quotation Drawing approval day With installation drawings Before booking Shipping docs · package
Installation laborEstimated installation labor hours per structureLabor hours for each structure on the layoutWith the quotation
Surfacing laying and base preparationSurfacing area table and thickness zone planArea by surfacing type, thickness under each pieceWith the quotation
Excavation and concrete footingsFooting detail drawingsConcrete footing size for every post, including swing beams, fitness stations and shade postsOn the drawing approval day
Indoor frame anchoringAnchor points marked on the drawingPosition of every frame anchor point, for your structural engineer to confirmWith the installation drawings
In-ground trampoline pitPit drawingThe pit your contractor builds for the courtWith the court drawings
Import duties and customs clearanceCommercial invoice with an per lineHS code for each quotation line, for your customs brokerWith the shipping documents
Local permits and inspectionInstallation drawings with use zones, compliance document list, inspection and maintenance guideUse zones, the named standard, an installer's completion checklistCompliance list with the quotationThe rest in the project package
Unloading and site deliveryLoading planContainer type (20GP or 40HQ) and how the container is loadedBefore the container is booked

Pricing before you sign

The labor hours and the surfacing area table come with the quotation, so your installer can price labor and surfacing before you place the order. Footing detail drawings are issued on the drawing approval day. Before that, your contractor estimates excavation and concrete from the layout and the number of posts on it, then confirms against the footing drawings once they arrive.

Excavated post footing holes with rebar cages on a playground site
Footing size for every post · on the drawing approval day

Tools and supervision

The tool list comes with the drawings and the security bits are in the spare kit, so your crew sources no special tools. A supervisor is an optional line. The labor hours also give an owner one figure to compare installer bids against.

HS codeThe customs tariff code for each quotation line. Your customs broker uses it to work out the duties before the container arrives.

Every line on your quotation is a piece you can find on your layout.

09/ 14Scope moves · specification stays

Budget OptionsScope Adjusted, Same Ø114 mm / 3.0 mm Specification on Every Quotation

Send your budget range with the site plan and the design office draws to it. A budget is met by changing the scope of the layout, with the material specification unchanged.

The design office draws one layout by default. On request, it draws an alternative within your budget range, on the same specification, so you can compare the two quotations line by line and choose what goes in now.

A QC inspector measuring the end of an evergreen post with a caliper at the incoming material area
Incoming check · Ø114 mm against the caliper
Layout A · default
Layout B · alternative within your budget range · on request
StructuresS1 + S2 · two structures
StructuresS1 · one multi-deck structure
DecksAs drawn
DecksBelow 30 in (762 mm) in the 2–5 area
FrameCustom-welded feature piece
FrameComponent system
SlidesCustom shape
SlidesExisting molds, standard colors
ThemeFiberglass figure
ThemeHDPE theme panels
ZonesAll zones now
ZonesPhase 2 later · same project file, part numbers, molds
Same on both · the four values on the spec sheet of every line
Posts · Ø114 mm / 3.0 mm · hot-dip galvanized + powder coated
Posts · Ø114 mm / 3.0 mm · hot-dip galvanized + powder coated
Panels · 19 mm UV-stable HDPE
Panels · 19 mm UV-stable HDPE
Rope · 16 mm six-strand, steel wire core
Rope · 16 mm six-strand, steel wire core
Fasteners · 304 stainless, tamper-resistant
Fasteners · 304 stainless, tamper-resistant
AmountOn your quotation
AmountOn your quotation

The four values that stay fixed · on a tight budget layout and a large one alike

Ø114 × 3.0 mmHot-dip galvanized, powder coatedSpecMeasure it when the container arrives
19 mm HDPEUV-stable panelsSpecMeasure it when the container arrives
16 mm ropeSteel wire coreSpecMeasure it when the container arrives
304 stainlessTamper-resistant fasteners, cappedSpecCheck the 304 marking on arrival

These values are on the spec sheet of every line. At the first of our four QC checkpoints, steel tube is checked per batch with a caliper and thickness gauge against Ø114 mm and 3.0 mm, HDPE sheet thickness is checked per batch against 19 mm, rope diameter is measured against 16 mm, and fasteners are checked for their 304 marking.

A batch that fails goes back to the supplier and never enters the workshop. Your QC readings are kept on file and included in the electronic project package.

How scope is adjusted

How phasing works for schools is on school playground equipment, and theme and color options are on custom playground solutions.

A caliper measuring a steel-core playground ropeA new playground beside an empty lawn area marked out with white line for a second phase
  • Fewer or smaller structures, or fewer decks
  • Lower decks below 30 in in a 2–5 area, with thinner surfacing
  • Component-system structures, custom welding kept to one feature piece
  • Slides from existing molds, in standard colors
  • Standard colors across panels, powder coat and covers
  • Fewer theme pieces, or HDPE theme panels in place of fiberglass figures
  • Phasing: phase 2 ordered later to the same project file
10/ 14FOB by default · CIF on request · USD

Shipping and Trade TermsFOB by Default, CIF on Request, Mixed Categories on One Container Plan

Quotations are issued FOB by default, and to your destination port on request. Sea freight time is quoted per destination.

Switch the terms · watch the boundary move

  1. Factory
  2. Loading · one container plan
  3. Port of loading
  4. Sea freight
  5. Destination port
  6. Customs clearance
  7. Your site
Structure and item linesOn your quotation
Surfacing and shade linesOn your quotation
Sea freight · to your destination port · CIFOn your quotation

Duties and customs clearance · your side · HS code per line on the invoice

One container plan

Every category, including partner-built inflatables, surfacing and shade fabric, is loaded on the same container plan in containers, scheduled to one loading date.

A clipboard with a printed container loading plan hung by a container door

Loading plan before booking

The loading plan, with container type, is sent before the container is booked.

Shipping documents

  • Bill of ladingEvery shipment
  • Commercial invoiceHS code per line
  • Packing listKeyed to part numbers
  • Certificate of originOn request

Duties and clearance are on your side; the HS code per line lets your broker work them out before the container arrives.

Structure cartons, a rolled shade sail, rubber tile pallets and a packed inflatable going into one container
Structures, surfacing, shade and inflatables in one container
CIFCost, insurance and freight: the quotation adds a sea freight line to your destination port.
20GP / 40HQThe two container sizes used: a 20-foot general purpose container and a 40-foot high cube.
11/ 14After installation · by part number

Lifecycle Cost10-Year Steel Warranty, Spare Parts by Part Number and Replaceable Sections

These parts of the supply set what it costs to keep the playground open after installation.

A hand photographing a cracked HDPE roof panel and its part label with a phone

Replacement by part number

Send a photo and the part number; QC confirms it against your part list and the replacement is made to the same number. Replies within 24 hours on business days; small parts by air courier, larger ones with your next shipment.

  • Photo + part number
  • QC checks your part list
  • Made to the same number
Steel structures
10 years
Rotomolded and HDPE parts
5 years
Rope, moving parts, soft play, jump beds and springs
2 years
  • A maintenance worker replacing one section of a rope net

    Rope · one section at a time

    Rope sections on the nets are replaceable one section at a time.

  • A soft play pipe cover opened halfway along its hook-and-loop closure

    Padding · Velcro or zip covers

    Soft play pipe covers come off for cleaning or replacement.

  • A scratch on a rotomolded part showing the same color underneath

    Rotomold · colored through

    Colored through the wall, so a scratch shows the same color underneath.

  • A rotomolded post cap on an evergreen post beside a small can of touch-up paint

    Post caps + touch-up paint

    Capped post ends; touch-up paint in the spare kit.

  • A whole welded frame lifted out of the galvanizing bath, silver zinc finish

    Steel · galvanized whole

    Galvanized as complete pieces (ASTM A123 or ISO 1461), then powder coated.

Custom parts on file: CNC cutting files, RAL codes, logo files and frame drawings stay in your project file, so a custom panel can be remade to its part number years later.

Spare parts can be ordered by part number outside a main order. An inspection and maintenance guide comes in the electronic project package.

12/ 14Revised with the drawing

Quotation Revisions, Validity and CurrencyRevised Together With the Drawing

Each revised layout comes back with the quotation revised to match.

  1. Drawing · Rev B
  2. Quotation · Rev B
  3. You approve again
  4. Loading date confirmed again

After drawing approval, a change goes onto a revised drawing that you approve again. The quotation is revised with it, and your project manager confirms the loading date again. Production runs 20–30 days after drawing approval, including theme and partner-built parts.

A designer placing a revised site plan beside a printed quotation, each with a blank revision label
Drawing and quotation carry the same revision
CurrencyUSD, other currencies on request
ValidityStated on each quotation
RevisionMatches the drawing
Production20–30 days after drawing approval
A dealer desk with a printed quotation with an empty letterhead area beside a 3D render
Letterhead left open for your name
13/ 14Unbranded or under your brand · from the first request

Dealer and Installer QuotationsDealer-Branded Files and Registered Projects

Dealers and installers receive the layout, renders and quotation unbranded or under their own brand, from the first request, and resell to their own client.

  • Each project registered under your name with the first layout request
  • End-client details kept confidential
  • Repeat orders by structure number, no redesign beyond the new site, 20–30 days after approval
14/ 14Two questions before the first quotation

Cost Planning FAQ

Q1

Does the quotation include installation?

The quotation includes the estimated installation labor hours per structure, so your installer can price the labor. Installation is done by your own crew or installer, with an on-site supervisor from our team available as an optional line.

Supervisor · optionalOn your quotation
A local installation crew fitting an evergreen deck to posts following an assembly drawing
Q2

What should I send to get a quotation?

Site dimensions, age groups, expected visitors, theme, budget range and the standard your project follows. For indoor sites, add column positions, clear ceiling height, entrances and fire exits.

  • Site dimensions
  • Age groups
  • Expected visitors
  • Theme
  • Budget range
  • Standard

Indoor · add column positions · clear ceiling height · entrances and fire exits

Send this list with your site plan

Upload your drawing and tell us the budget range in your own words. The amounts come back on your itemized quotation.

Site type
Standard your project follows
Optional lines to include

File attached? Anna will ask you to send it by email or WhatsApp after the form arrives.

Form not going through? Message Anna on WhatsApp +86 177 0272 7677

Send Site Plan WhatsApp