Commercial Playground Planning Checklist
Eight inputs the design office needs from you, from the site plan to the install scope, so the first layout is one you can price, approve and build.
Read the checklistBlog · Run Playgrounds project team
Each article answers one decision a dealer, parks department, school or FEC founder makes before ordering, with the numbers the design office actually works to.
01Articles
01 article · 06 categories
Eight inputs the design office needs from you, from the site plan to the install scope, so the first layout is one you can price, approve and build.
Read the checklist02Before you write
Send these with your site plan and the design office returns a 2D + 3D layout, a material spec sheet and the compliance document list for your quotation.
Send Site Plan
Overall size, slope, fixed objects, access and where parents sit.
Age bands served and the busiest hour you expect.
ASTM F1487 with the CPSC handbook, or EN 1176 and EN 1177.
Column positions, clear ceiling height, entrances and fire exits.
Brand colours from the RAL chart, a story theme, inclusive-play needs.
A range to plan against, and whether a local installer is chosen.
Site size, age groups and the standard you build to are enough to start. The layout, a material spec sheet and the compliance documents for your quotation come back together.
